Our CFA method is one of the least stressful piling setups available. We provide CFA without vibration, which is excellent for working close to existing buildings or in earth-tempered zones.

WhatsApp Image 2021 12 02 at 1.29.53 AM
WhatsApp Image 2021 12 02 at 1.27.01 AM
WhatsApp Image 2021 12 02 at 1.26.59 AM 1 1
SFA Open Bore Piling

CFA Piling In Essex & London

If you’re wondering what is CFA piling, then we’ve got the answer. CFA stands for (Continuous Flight Auger). Our CFA method is one of the least stressful piling setups available. We provide CFA without vibration, which is excellent for working close to existing buildings or in earth-tempered zones. We offer CFA piling for both secant retaining dividers and weight-bearing piles. At Prime Piling, we take great satisfaction in being the best auger piling contractors. We are frequently selected for our superior and all-inclusive packages. To meet the goals and specifications of your building project, we work hard to deliver exceptional service, specialised labour, and an excellent finished result.

Services

Our Services

Mini Piling

Prime Piling has built up to become one of the best Mini Piled Underpinning service providers.

SFA Open Piling

SFA piling is an ideal solution for building with limited access.

SCD Piling

SCD (Steel Cased Driven) Piling is a bottom-driven piling using a vibrating mole or a drop hammer piling rig

Need some help with your project?

With over 20 years of experience and knowledge we offer a complete package with all foundation work, including design, drawings and calculations.

Portfolio

Our Recent Work

PRIME PILING

WHAT DISTINGUISHES PRIME PILING AS THE BEST CFA PILING CONTRACTOR?

We know how crucial it is to choose knowledgeable CFA piling contractors. At Prime Piling, we are completely aware of the conditions and the impact of the building method on various surfaces. To ensure workability, we meticulously manage everything. We never employ underpowered piling rigs since doing so might result in uncontrolled soil transport. Prime Piling only employs the best tools and knowledgeable personnel to guarantee that problems and complications don’t arise throughout your job. Our continuous flight auger piling is one of the quietest types of piling available. It is the perfect answer for environmentally sensitive places. Our CFA is an excellent piling service that requires little interruption and no noise.

WhatsApp Image 2021 12 02 at 1.29.46 AM
WhatsApp Image 2021 12 02 at 1.30.00 AM 1
SCD Piling Contractors q026mbwgd5avwjkdlnh62tpfyzqmlqy3vzqbdo1cm8
Prime Piling

Our CFA procedure

To begin, we continuously drill the surface to the required depth. Once the requisite depth has been reached, we install concrete using a hollow stem auger and a piling rig. Then we gradually remove the auger, and we immediately attach reinforcement steel cages. We use long pieces, usually made of metal or concrete, and bury them underneath. Then these pieces reach a solid layer that enables the structure’s weight to be securely transferred down towards the strong level. By using our CFA piling technique, we create piles inside the ground that are permeable to water. We utilise our piling expertise to keep your construction moving smoothly. Whatever your project demands, we can quickly respond with a solution that is also affordable, thanks to our resources. We currently serve numerous commercial clients, and we can be your next best choice for piling operational assistance.

OUR CFA OPERATIVES

Construction projects include a great deal of intricate planning, measurement, and manpower, and the piling process is a challenging procedure that needs the right personnel to do the work. Here is a list of everyone involved in our CFA piling team:

FAQ

Frequently Asked Questions

Piling is the process of inserting structural piles into the ground that will become the base of the building. Piles are required where soil and earth are performing poorly and are used to spread the load of a building and firm the ground. They are a cost-effective approach to combating corrosion and are proven to significantly improve the life expectancy of a structure

The size of the trench depends on the size of the ground beam to be installed. For our typical ground beams to an extension an excavation of 600mm deep and 450mm wide is sufficient. Please ring for advice.

There are a number of reasons it may be: A site investigation has highlighted that the ground is unsuitable and un-useable to a depth of more than 2 metres. Removal costs for the excavation of traditional deep trench foundations are too expensive. Foundation trenches are not stable and health and safety, therefore, becomes an issue. There is a high-water table. Where there are soils such as clay that are likely to swell or shrink excessively depending on the amount of water content.

The job of the pile is to distribute the weight of the structure evenly. They are placed into the ground using a pile driver. Holding the piles perfectly vertical, this machine hammers each structure into the ground and also acts as a crane.

For a typical house extension, the work can take around 2-3 days, depending on the depth driven and services requested. For more complex projects, contact us for a more specific time frame.

Mini piling in Essex and Colchester is a type of specialist piling that incorporates a specific arrangement and number of driven pile and screw pile varieties. It allows for the expansion or extension of a building, while also safeguarding against ground heave and subsidence. Crucially, mini piling is often a cheaper, faster option than traditional deep trench foundations.

Contact us

Speak to one of our team today

07872 591446

Give the team a call

Ducketts wharf, South Street, Bishops Stortford, CM23 3AR

Location