We provide construction services Strip foundation – a foundation in which a continuous strip of cement is laid under the load-bearing pile separators.

WhatsApp Image 2021 12 02 at 1.29.53 AM
WhatsApp Image 2021 12 02 at 1.27.01 AM
WhatsApp Image 2021 12 02 at 1.26.59 AM 1 1
Strip Foundation

Strip Footing Foundations In Essex & London

We provide construction services Strip foundation – a foundation in which a continuous strip of cement is laid under the load-bearing pile separators. It evenly distributes the weight of the load-bearing pile divider over the absolute space of the soil. The foundation can be made of both conventional concrete and cement.

Strip footing is normally utilized as foundations for load-bearing dividers; and when the soil has a great bearing limit. It is liked for the low ascent to medium ascent private structures. Here strip of substantial runs beneath the whole length of the divider, in this way, disseminating the heap from the dividers to the ground. This offers better strength to the structure. Consequently, the width of the footing ought to be to some degree twice the width of the divider. Now and again, strip foundations are utilized to help a line of firmly separated sections. In such a case a strip footing slab would be more affordable than the spread footings that cross over one another. The specific width of the heap bearing divider and the footing is subject to the soil condition.

Services

Our Services

Mini Piling

Prime Piling has built up to become one of the best Mini Piled Underpinning service providers.

SFA Open Piling

SFA piling is an ideal solution for building with limited access.

SCD Piling

SCD (Steel Cased Driven) Piling is a bottom-driven piling using a vibrating mole or a drop hammer piling rig

Need some help with your project?

With over 20 years of experience and knowledge we offer a complete package with all foundation work, including design, drawings and calculations.

Portfolio

Our Recent Work

Strip Footing Foundation

What are the steps of creating a strip footing foundation?

You can be done strip footing foundation yourself or with the help of professional contractors. The steps of strip footing foundation construction are:

Parceling:

Eliminate trash from the spot and begin apportioning by putting on the ground both outer and interior lines of things to come foundation. Use stakes or support bars and ropes. When stamping is done, you ought to investigate minor departure from the outer layer of the building site and select the absolute bottom to allude to when checking the profundity of the channel and to take out the distinction in the foundation tallness.

WhatsApp Image 2021 12 02 at 1.29.46 AM
WhatsApp Image 2021 12 02 at 1.30.00 AM 1
SCD Piling Contractors q026mbwgd5avwjkdlnh62tpfyzqmlqy3vzqbdo1cm8
Prime Piling

The groundwork for the development of a strip foundation

At the point when the channel is prepared, fill in a sandy base enhanced with rock on the base.

Foundation formwork is made of planed loads up with a thickness of around 40-50 mm. When raising the formwork, you should screen its verticality constantly. The suggested projection of the casing over the ground is 12 inches. It is important to construct a little base.

The following stage is building foundation support. Supporting bars with 10-12 mm segments are bound with explicitly planned restricting wire so the sides of square cells were equivalent to 12-16 inches. For the support, you can utilize either steel or fibreglass building up bars. While setting the support in the channel, watch indents from the edges. The ideal cushioning is 50 mm. For this situation, the support will be most adequately situated in the stone monument.

Pouring substantial strip foundation

Spilling concrete is completed promptly on account of prepared blended concrete or in layers if the substance is arranged freely.

  • Readiness of cement: concrete is blended in with sieved waterway sand in the proportion of 1:2 – 1:2.5, and weakened with water to a fluid cream consistency, after which it is poured onto the pre-arranged rock. The measure of rubble compares to that of sand. Mix the blend so all the rubble got saturated with an answer.
  • Empty the substantial into the pre-arranged formwork. Puncture the substantial in a few spots utilizing a metal bar and smaller it with a wooden square to eliminate the remainders of the air from the voids.
  • Pour the substantial to the level demonstrated on the formwork. In this way clatter the formwork from an external perspective for a better drop of cement.
  • The top layer is lined up with a standard or scoop.
  • Residue the substantial with filtered dry concrete; you can do it through a sifter. This technique lets the top layer of cement solidify a little and forestalls its disintegration and breaking.
  • Cover the substantial with burlap or covering material and leave for 3 a month. In a dry climate, you need to saturate the top layer of cement to keep it from drying out.
FAQ

Frequently Asked Questions

Piling is the process of inserting structural piles into the ground that will become the base of the building. Piles are required where soil and earth are performing poorly and are used to spread the load of a building and firm the ground. They are a cost-effective approach to combating corrosion and are proven to significantly improve the life expectancy of a structure

The size of the trench depends on the size of the ground beam to be installed. For our typical ground beams to an extension an excavation of 600mm deep and 450mm wide is sufficient. Please ring for advice.

There are a number of reasons it may be: A site investigation has highlighted that the ground is unsuitable and un-useable to a depth of more than 2 metres. Removal costs for the excavation of traditional deep trench foundations are too expensive. Foundation trenches are not stable and health and safety, therefore, becomes an issue. There is a high-water table. Where there are soils such as clay that are likely to swell or shrink excessively depending on the amount of water content.

The job of the pile is to distribute the weight of the structure evenly. They are placed into the ground using a pile driver. Holding the piles perfectly vertical, this machine hammers each structure into the ground and also acts as a crane.

For a typical house extension, the work can take around 2-3 days, depending on the depth driven and services requested. For more complex projects, contact us for a more specific time frame.

Mini piling in Essex and Colchester is a type of specialist piling that incorporates a specific arrangement and number of driven pile and screw pile varieties. It allows for the expansion or extension of a building, while also safeguarding against ground heave and subsidence. Crucially, mini piling is often a cheaper, faster option than traditional deep trench foundations.

Contact us

Speak to one of our team today

07872 591446

Give the team a call

Ducketts wharf, South Street, Bishops Stortford, CM23 3AR

Location